ETED to Boost Electrical Transmission Capacity in Bonao
ETED will conduct infrastructure upgrades on the 69 kV transmission line between Zona Franca Dos Ríos and Bonao starting October 13th. These works aim to increase energy transport capacity and strengthen the grid for Monseñor Nouel's growing demand. Temporary service interruptions are expected in affected areas.
Sources (1)
- HoyOct 11, 12:00 AM